Cooling Tower Installation

SIMPLE Installation 

In our commitment to simplify the installation process of CHEMTROL® controllers, we have streamlined everything onto a customized assembly manifold, prepared for easy connection.

This approach ensures proper water sampling around the sensors, facilitating a hassle-free installation that minimizes the integration work required to get your water treatment system operational.

For architects and engineers preparing bids, listed below are various installation options to accommodate diverse requirements.


Bypass line assembly (BPL), Programmable controller range
A choice of 4 models available

The CHEMTROL® cooling tower setup comprises two grey PVC backboards, featuring the CHEMTROL® model CT110— a 6-relay output control system accommodating up to five wired dosing pumps. The customized assembly manifold, equipped with grey uPVC fittings, is ready for seamless connection.

CLOSE